Skip to main content
Global

Tohoku Agricultural Policy Bureau Received an order for renovation work at the disembarkation machine (Aomori)


Ebara Manufacturing Co., Ltd. (hereinafter referred to as "Ebara") is pleased to announce that it has received an order for pump equipment renovation work at the disembarkation power machine (hereinafter referred to as the airport) as part of the state-run Tsugaru Northern Phase 2 Agricultural Water Conservancy Project for Heisei 27 ~ Reiwa 5 years.

1. Background and Objectives

This area is a vast paddy field located in the northern part of the Tsugaru Plain in Aomori Prefecture. The production of soybeans, wheat, vegetables, etc., with a focus on paddy rice, is also being developed. Many of the main pumping and draining stations that support this area are more than 30 years old, and in recent years, the equipment has deteriorated over time. The renovation of the pumping equipment is expected to provide a stable supply of water for agriculture, maintain the drainage function, and reduce equipment maintenance and management costs.

2-1 Overview

Construction Name Tsugaru Northern Phase 2 Agricultural Water Conservancy Project Renovation of Pump Facilities at Disembarkation Machinery Station
Orderer Ministry of Agriculture, Forestry and Fisheries, Tohoku Agricultural Policy Bureau
Construction site Aomori Prefecture Tsugaru City 下車力町175-7
Pump Specifications (excerpt) No.1 and 2 Main Pumps Vertical Shaft Diagonal Flow Pump (Model 1650VZGE)
φ1650 mm × 6.045 m3/s ✕ 5.5 m ✕ 449kW 2 units
No.3 Main Pump Horizontal Diagonal Flow Pump (Model 1200HZGM)
φ1200 mm× 3.33 m3/s ✕ 5.52 m ✕ 250kW 1 unit
No.4 Main Pump Horizontal Diagonal Flow Pump (600HZM type)
φ600 mm× 0.83 m3/s ✕ 5.8 m x 75kW 1 unit
construction period October 2019 ~ March 2023

3. Future developments

This renovation work will contribute to the improvement of agricultural productivity and stable agricultural management in this area. EBARA has the top delivery record of agricultural irrigation facilities in Japan, and is currently carrying out many projects such as new construction, renewal, and remodeling. As a leading manufacturer in the pump business, we will continue to solve our customers' problems with a competitive and challenging mindset and contribute to the development of infrastructure facilities that provide peace of mind.


The EBARA Group will contribute to the achievement of the Sustainable Development Goals (SDGs) by working on the Medium-Term Management Plan and key ESG issues in order to further enhance its corporate value based on its management policy.

Promote efficient water use