Features
Highly difficult construction work performed
While ensuring the drainage function of the pumping station, the renewal work for all six pumps was carried out from October to May, when the river is not flooded, by removing one pump at a time and installing a new pump. The new pumps were installed.
Improved functionality
EBARA's proprietary flow analysis technology has improved efficiency on the high flow side from the design flow (the amount of water expected to flow in).